Demonstration of an actively managed planning approach for connection of renewable generation

Steven Conner, Gareth Harrison

Research output: Contribution to journalArticlepeer-review

Abstract / Description of output

UK carbon reduction targets have seen a rapid and sustained increase in renewable generation developers seeking connection to the distribution network. This study presents through simulations, the positive results that can be seen by integrating active network management techniques into the network planning scheme. The method is devised to allow distribution network operators to utilise the full available network capacity and as a result connect additional distributed generation.
Original languageEnglish
Pages (from-to)2209-2211
JournalCIRED Open Access Proceedings Journal
Volume2017
Issue number1
DOIs
Publication statusPublished - 31 Oct 2017
EventCongrès International des Réseaux Electriques de Distribution (International Conference on Electricity Distribution) 2017: 24th International Conference & Exhibition on Electricity Distribution - Scottish Event Campus (SEC), Glasgow, United Kingdom
Duration: 12 Jun 201715 Jun 2017
Conference number: 24
http://www.cired-2017.org/