Erratum for “Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs.-BIM System” by Frédéric Bosché, Adrien Guillemet, Yelda Turkan, Carl T. Haas, and Ralph Haas

Frédéric Bosché, Adrien Guillemet, Yelda Turkan, Carl T. Haas, Ralph Haas

Research output: Contribution to journalArticle

Abstract

The following corrections should be made to the original paper:

During composition, the term “Scan-vs-BIM” provided in the manuscript was erroneously changed to “Scan-vs.-BIM” in the title. The correct title is “Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs-BIM System.”

The term is also erroneously listed as “Scan-versus-BIM” in the text. “Scan-vs-BIM” should have been retained in all the instances, as this refers to the name of the system being discussed.

ASCE regrets these errors.
Original languageEnglish
JournalJournal of Computing in Civil Engineering, ASCE
Volume28
Issue number4
DOIs
Publication statusPublished - 1 Jul 2014

Fingerprint

Dive into the research topics of 'Erratum for “Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs.-BIM System” by Frédéric Bosché, Adrien Guillemet, Yelda Turkan, Carl T. Haas, and Ralph Haas'. Together they form a unique fingerprint.

Cite this